OFFICE WI-FI PLANNING BRIEF BusiQuip resource — prepared 12 November 2026 A requirements worksheet, not a network design or performance guarantee. Do not include passwords, access codes or sensitive customer records. OFFICE AND SCOPE Office/location: Authorised contact and administration owner: Work areas included / excluded: Floor sketch available? Floors, walls, access restrictions: Existing equipment locations (if known): Known power points / network outlets / cable routes: Planned team, premises or device changes: REPEAT FOR EACH WORK AREA Area: Essential task and application: Usual devices / operating systems, if known: People and devices active together during the busiest relevant period: Visitors or shared devices: What successful work looks like: Priority / business impact if unavailable: Unknowns to check during the survey: SYMPTOM LOG — COPY FOR EACH OBSERVATION Date and time: Area and device: Task/application and observed symptom: Who else was affected at the same time? Were wired devices affected too? Known / unknown: How long did it last? How did work continue? Technician's findings and evidence (leave blank until assessed): ACCESS REQUIREMENTS Who needs staff access? What should guests access, and for how long? Any specific shared resources or contractor needs? Who approves and administers access? How will the agreed restrictions be tested? COMPARE THE PROPOSAL Observed problem or agreed requirement addressed: Keep / adjust / extend / replace — and why: What remains unchanged and what remains unresolved? Assessment assumptions and further measurements needed: Equipment, installation, cabling and configuration scope: One-off and recurring costs (from the actual quote): Support responsibilities and exclusions: AGREE AND RECORD ACCEPTANCE TASKS Area / task / actual device and application: Concurrent activity and other agreed test conditions: Acceptable outcome agreed by: Test date / participants: Observed result: Unresolved item / owner / next action and review date: CHANGE AND HANDOVER Agreed change window: Plan for essential work if the change takes longer: Who approves any additional scope or cost? Equipment location and configuration records received: Authorised administration owner: Support contact and agreed next review: NEXT STEP Discuss your brief and request the assessment scope and costs: https://busiquip.com/services/it-networking